Proposal BulletsDate Submitted by Job Name Permits NeededNot NeededCall for locates YesNoElectrician Required YesNoJob Materials In StockNeed to OrderInclude the following bullets in proposal: Permits are not included Water & sewer stub out only Cutting of concrete by MSP, patching to be completed by third party Fire proof to be completed by third party All water lines to be run in Flowguard Gold CPVC and underground whenever possible All water lines to be run in Pex Backfill of ditches to be completed by third party MSP is not responsible for any existing sanitary lines MSP is not responsible for any unforseen problems that may occur during construction MSP is not responsible for replacement of any sod or if the existing grass dies during construction MSP is not responsible for any patching or repair of damage to walls, floors, etc; this must be completed by appropriate contractor. All fixtures to be by specs or equal One year warranty on parts & labor supplied by MSP Payment is due upon completion MSP is not responsible for seeding or final grade MSP is not responsible for any electrical work; electrical work must be completed by third party Sewer is priced for gravity flow; if pump is required due to lack of fall, additional labor & material charges will be billed MSP is not responsible for the excavation or fill material MSP is not responsible for any dewatering; if dewatering is needed an additional cost will apply Remove cut concrete to dumpster supplied by third party VerificationPlease enter any two digits *Example: 12This box is for spam protection - please leave it blank: